Arberi

From June 1, a part of the Kaçanik - Hani i Elezit road is blocked

Blockage - Road

Photo: Illustration

The Ministry of Infrastructure has announced that starting from June 1, 2024, a part of the segment of the national road N2, Kaçanik-Hani i Elezit, will be blocked for vehicle traffic.

The blocking of this segment is said to be due to the development of works on the railway, the southern part of railway 10 (Fushë Kosovë - Hani i Elezit).

Heavy vehicles transiting Kaçanik will be able to travel through the "Arbën Xhaferi" highway. Meanwhile, other vehicles can use the bypass built on "Agim Bajrami" road (heavy vehicles are excluded)", the Ministry's announcement states.